Power and Sites / Free calculator

Power cost model

See the energy cost of a compute load, or solve for the load or electricity price your budget allows.

Type into any number field to pin it. Calculated fields carry a rust-colored rule. Clear a pin to let it solve again. Starting values are editable assumptions, not measured facts.

Your numbers

Verify all units and results for your own use.

Your results

Your worksheet

Download or copy the complete entered and calculated values without giving us an email address.

Read or copy the worksheet

Email is optional.

Full results and the worksheet are free above. Each button requests only the extra it names. No other list is bundled in.

Notification signup sends your email address and the notification you choose to Buttondown. Check your inbox to confirm. Worksheet and saved-link email delivery remain disabled.

Technical notes and factor sources

Factors as of: 2024 (EIA annual all-sector state averages)
Review date: 2026-10-31 (build review, not engineering signoff)

Energy-only model. State averages are references, not tariff quotes. Demand charges, taxes, delivery charges, escalation, minimum bills, curtailment and generation costs are not modeled. Load is IT load; PUE scales it to facility load.

Declared relations

  • monthly = 10 x mw x pue x monthHours x price
  • annual = 12 x monthly
  • monthly = 1000 x mw x kwMonth

All fields solve from the declared relations in either direction when a unique value exists. Calculated values use full precision. Conflicts use a relative tolerance of 0.01%, with an absolute floor of 0.000001. Zero divided by zero has no unique solution. A cleared field can be calculated again when other entries determine it.

Preloaded rates: EIA State Electricity Profiles 2024, all-sector average retail price, cents/kWh. Wyoming: 9.14. Not industrial-only rates, real-time prices, or contract quotes.

Annual cost assumes twelve identical model months. Default month: 365 x 24 / 12 = 730 hours. If you change month hours, annual cost remains twelve copies of that month. Cost per kW-month uses IT load, not facility load. PUE is facility energy divided by IT energy.

constants / sourced values
mw-to-kw
1000 kW/MW. Source: SI prefix definitions, BIPM SI Brochure, Table 7. Factors as of 2019; review 2026-10-31.
annual-months
12 model months/year. Source: Model convention: twelve identical months, not an EIA factor. Factors as of 2026-10-31; review 2026-10-31.

Sources by name

  1. U.S. Energy Information Administration: State Electricity Profiles 2024 (released November 10, 2025)
  2. The Green Grid White Paper 49, hosted by Lawrence Berkeley National Laboratory: PUE = total facility energy / IT equipment energy

Results are estimates for planning. Permit and engineering decisions need a qualified professional.

Keep the tools on your phone.

iPhone: open this page in Safari, tap Share, then Add to Home Screen. Android: use Chrome's Install app or Add to Home screen menu.

Preparing offline tools. Keep this page open until they are ready.

Your numbers stay in this browser on this device. Browser cleanup can remove them. We do not use cookies or send your numbers to a server.